East Lincoln Street Reconstruction (2026)

Project Area

The full right-of-way of East Lincoln St from North Main St (west) to North Perry Pkwy (east), including intersections of East Lincoln St with Soden Dr and North Oak St.

 

Project Description

The East Lincoln St Reconstruction project will include replacement of the roadway surface with new aggregate base material and asphaltic surface; replacement of curb and gutter; replacement and improvement of curb ramps, sidewalks and driveway aprons; replacement of sanitary sewer and sewer laterals; replacement of water main and water services; and replacement/upgrading of storm sewer including inlets/catchbasins, manholes and storm sewer pipe. Private sump pump connections will be provided for all residents to connect their sumps to the public storm sewer system, and any existing sump pump connections to the public sanitary sewer system will be terminated. 

 

This project will be partially funded by the Wisconsin DOT Surface Transportation Program (STP) Urban program, and will be administered by WisDOT staff.

 

Project Timeline (Preliminary)

Construction is projected to begin in early to mid-Spring 2026, with an estimated substantial completion date of mid-Fall 2026. More specific information regarding schedule will be provided as the project construction date nears.